7.7 Commissioning the lifting column

Only authorised personnel may commission a drive unit. The safety regulations and instructions in
this installation manual must be read and obeyed.
Before commissioning, you must check the lifting column for damage and note the instructions
for operating same (see section 7.3). If you cannot detect any damage, then the lifting column
can be used.

7.7.1 Commissioning a single lifting column

Test the safe state of the lifting column. Connect the lead in accordance with the installation in-
structions for the external controller and follow the procedure in the instructions. Note when rais-
ing and lowering the lifting column that this operates the limit switch and at the same time
switches the lifting movement off in the top and bottom end positions.

7.7.2 Commissioning a number of lifting columns

Test the safe state of the lifting columns. Connect the lead in accordance with the installation in-
structions for the external controller and follow the procedure in the instructions. Note when rais-
ing and lowering the lifting column that this operates the limit switch and at the same time
switches the lifting movement off in the top and bottom end positions.
An initialisation run on the lifting columns must take place before installing the lifting
columns. The lifting columns should not be interconnected mechanically at this time.
Other connections and mechanical factors which may damage the lifting columns
must not be present. There is a danger of breakage.