Installation Layout; Preparatory Steps; Installation - KEY STAR 300 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34
8
5
1
6
The new series of actuadors AXIL, has been devised to serve gates up to 300 Kg with leaf up to 2,8 meters
wide.
Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Hinges and pins are in optimum condition and properly greased.
• No obstacles are within the moving area.
• There is no friction with the ground or between the leaves.
• Your gate is equipped with a central latch.
Open the packaging and check that the gear motor has not been damaged during transport
Install the ledges for the opening and closing

INSTALLATION LAYOUT

4
5

PREPARATORY STEPS

INSTALLATION

12
1
actuator
2
Blinker
3
Aerial
4
Key or digital selector
5
Photocells
6
Column
7
Warning board
8
Control unit
7
5
5
6
1
3
2

Publicidad

Tabla de contenido
loading

Productos relacionados para KEY STAR 300

Tabla de contenido