Installation Procedure - Toto TS100G Manual De Instrucciones

Barra deslizanta
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
Determine the slide bar position and drill the pilot holes. ( Pilot holes diameter:
1/8"-5/32").
NOTE: If the wall is tile or concrete, please install the enclosed Fisher plues where
the slide bar will be mounted. (Drill diameter: approx. 1/4").
2.
Put the packing on the mounts. (Two places) (Pilot hole diameter: 1/8"-5/32").
3.
Put the set screws through the
washers and tighten into the
mounts.
4.
Place cover on mounts at
the top and bottom.
NOTE: Do not mix up the
top and bottom cover. The
cover with the TOTO logo
should be on the bottom.

INSTALLATION PROCEDURE

Set screw
Bottom cover
4
Caution
Make sure the slide
bar is oriented
correctly
Packing
Mount
Washer
Top Cover
Mount
Mount
Slide
Top
Hanger
Guide or
Bottom
Bottom
Pilot hole
(1/8"-5/32")
<For Tile or
Concrete>
Fisher Plug
(Drill Diameter: ~1/4")
n

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ts100gr

Tabla de contenido