Chapin 81000A Operación Instrucciones página 2

Ocultar thumbs Ver también para 81000A:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Auger is designed to work in forward motion. Excessive reverse motion could cause binding. If
resistance is felt while pulling spreader backwards, stop and clear salt from auger.
ASSEMBLY INSTRUCTIONS
Approximate assembly time is 5-10 minutes
Suggested Tools:
Wrench and/or Ratchet Set
• Assemble handle to uprights with Hex bolts and nuts.
• Tighten M6 nuts completely.
• Attach bail assembly spring to gate control (Fig. A).
Bolts
Handle
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
WARNING
M6 Hex
Nuts
Figure A
* Note: If spring detaches from bail assembly,
simply re-attach (see Figure A).
Fully Assembled

Publicidad

Tabla de contenido
loading

Tabla de contenido