Descargar Imprimir esta página

Alkari ALK-B-400 Manual De Usuario página 12

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation instructions and installation of surface heating 
1.  
Deposit the packed Alkari panel on the floor so that the label is on the upper side of the carton. Now 
open the cover plate carefully. To reduce the danger of damages please open the heater package in 
the room where you intend to install the heater. 
Note that an exact positioning of the screws is the basic for the simple and trouble‐free assembly.           
         
2.  
Mark the 4 drill positions by using the dimensions of the drawing on top of this page. Please note the 
orientation of the heater. 
Using a water‐level is recommended. 
Tip: Before drilling the holes please check if tubes or wires are present in this area. Use a suitable metal 
detector.  
 
3.  
Drill the 4 holes by using a Ø8mm drill (depth=length of the dowel). The depth of the holes should not 
differ much from the dowel length. To ensure this demand please mark the drill or use a depth stop. 
Tip: To avoid the formation of dust it is recommended to use a vacuum cleaner simultaneously. 
 
4.  
Push the dowels in the holes and screw the screws in.  
 
5.  
Fix  the  4  holders  with  hexagon  screws  on  the  heater  backside  so  that  they  are  still  turn  able.  The 
mouths of the holders should be orientated in ground direction. Hang the heater to the 4 wall screws.  
Turn 1 of the bottom holders 90° or 180° and use a suitable wrench to fix the screws on the heater 
backside. Now the heater is fixed on the wall. Don't use other screws than the delivered ones for longer 
screws will damage the heating element! 
 
Important: Although the infrared panel heater is equipped with a good thermal insulation there will 
be higher temperatures also on the backside of the panel. If the heater is too close to the wall or ceiling, 
there  could  be  a  heat  accumulation  on  the  back.  The  mounting  distance  must  not  be  underrun.  A 
continual airflow behind the heater should be guaranteed. 
 
6.  
Congratulations! The heater is mounted completely and is ready for use now. The plug can be inserted. 
 
 
 
 
 
 
 
 
 
11 

Publicidad

loading