EN
2- Fix to wall by means of screws provided. It is essential for the evaporation system that the device
is properly aligned; it is therefore advisable to use the bubble level included on the support fixed
to wall. Installation height must be as follows:
1 meter
3- Start up the hand dryer by connecting it to power supply.
4- 2- If when you are operating the hand dryer for the first time, you notice that the sensors do
not detect hands properly, it will be necessary to calibrate sensors again. This can be done by
removing front cover. To disassemble front cover, remove two screws at the bottom, and slide it
vertically upwards, where you will find main switch of the device. The switch will be set in "ON
position" when the device is delivered.
OFF
ON
Screws to fix
front cover
Pag.6
JOFEL INDUSTRIAL S.A.
RECOMMENDED MOUNTING HEIGHT
OF HAND DRYER
Z
Z = 90 cm
* Z shows required distance from floor to
the centre of hole of the metallic support to
fix hand dryer to wall.
Screws for wall fixing. It is recommended to use
screws and wall plugs in all 5 fixing holes.
C/ La Rioja nº3 Alicante, España
JET SMART HAND DRYER
Z = 85 cm
Slide cover
upwards to
remove it
Screws to fix
front cover
www.jofel.com