On gas meters without an oil pump, the section
entitled "To insert oil" can be omitted (continue
with "Commissioning").
To insert oil:
Open the cover of the oil supply tank (see
Fig. 5).
Fill the oil supply tank with the supplied oil.
The oil quantity is sufficient when the oil level is visible in the strainer.
The oil pump must be actuated as follows:
Table 8 | Commissioning
Meter size:
DN 50
DN 80/100
DN 150
Commissioning:
Slowly fill the system until the operating
pressure is reached.
The pressure rise must not exceed
350 mbar/s.
A bypass line should be used for filling
(recommendation:
diameter).
Do not exceed the measuring range of
the gas meter even briefly.
A tightness test must then be carried out.
24
Commissioning
Number of strokes:
Oil pump with lever
3
5
7
73018696f
Pushbutton oil pump
6
10
14
12 mm
pipe