DAB e.sybox Instrucciones Para La Instalación Y El Mantenimiento página 71

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 558
• Disengage the 4 screws at the corners of the panel using the hex
wrench provided with the accessory tool.
• Do not remove the screws, just disengage them from the thread
on the product body.
• Be careful not to drop the screws into the system.
• Move the panel away, taking care not to pull on the signal trans-
mission cable.
• Reposition the panel in its seat at the preferred angle taking care
not to pinch the cable.
• Tighten the 4 screws with the wrench.
2.2.3 Loading Operation
Installation above head and below head
Figure 10
With reference to its position with respect to the water to be pumped, the instal-
lation of the system may be defined "above head" or "below head". In particular
the installation is defined "above head" when the pump is placed at a level
higher than the water to be pumped (e.g. pump on the surface and water in
a well); vice versa it is "below head" when the pump is placed at a level lower
than the water to be pumped (e.g. overhead cistern and pump below).
Installation "above head": with the aid of the accessory tool (Fig.3_point 5) or
with a screwdriver, remove the filling cap which, for the horizontal configuration,
is the one on Face F (Fig.1). Fill the system with clean water through the load-
ing door, taking care to let the air out. The quantity of water with which to fill the
system must be at least 1.5 litres. It is recommended to fit a non-return valve at
the end of the suction pipe (foot valve) so as to be able to fill it quickly too dur-
ing the loading operation. In this case the quantity of water necessary for the
loading operation will depend on the length of the suction pipe (1.5 litres + ...).
Installation "below head": if there are no check valves between the water de-
posit and the system (or if they are open), it loads automatically as soon as it is
allowed to let out the trapped air. So slackening the filling cap (Face F - Fig.3)
enough to vent the air allows the system to load completely. To slacken the cap,
GB
ENGLISH
Figure 11
68

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E.sybox 30/50

Tabla de contenido