Descargar Imprimir esta página

Preparing Hot Water - Grundig GKI 1120 B Instrucciones Para El Usuario

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 359
Use
8
• Introduce only pre-ground coffee for espresso
coffee machines into the funnel.
• If more than one measure of pre-ground cof-
fee is used and the funnel clogs, push the cof-
fee down with a knife. Then remove and clean
the brewing unit and machine as described in
the "Cleaning the brewing unit" section.

Preparing hot water

Hot water can be used to warm up cups and to
make hot drinks, such as tea or packet soups.
Warning! Only activate the hot water spout
when there is a receptacle underneath it.
Escaping hot water can lead to scalds!
1. P ut the hot water spout in place.
2. P lace a container underneath the hot water
spout.
3. P ress the 'Hot water' touch key (8). Hot
water is dispensed; the display shows "HOT
WATER". Once the programmed amount of
hot water is dispensed, dispensing stops
automatically. For a few seconds the display
shows "PREPARATION RUNNING PLEASE
WAIT". After that the appliance is ready to
make coffee again and the last selected
coffee setting appears on the display.
Changing the quantity of hot water
The machine is set by default to automatically
delivery 150 ml of hot water. To change these
quantities, proceed as follows:
1. P lace a container underneath the water
spout.
2. K eep the 'Hot water' touch key (8) pressed
until the message "PROGRAM QUANTITY" is
displayed and hot water delivery begins.
3. A s soon as the hot water in the cup reaches
the required level, press the same icon again.
The quantity set has now been programmed.
EN
DE
IT
SV
FI
NO
DA
TR
RO
FR
ES
15

Publicidad

loading

Este manual también es adecuado para:

Gki 1221 x