ColdKit Matrix Manual Del Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5.
Installation of Accessories and Finishings:
5.1. Insert the cups into the vertical and ceiling panels.
5.2. Fill the holes in the floor panels with 17 x 10 polythene on, inserting them from 5 - 8 mm at most.
Insert the caps into the floor panels.
5.3. For cold room without floor, install the skirting using rivets and silicone.
To put the cups
(Piece H)
to measure.
Open the lid which hides the holes in the skirting and screw them to the vertical panels.
NOTE: Put on the edges, the tops of the finishing (Next to doors and passages).
5.4. The interior coving section has 2 pieces. One of them is screwed to the panel.
The second is clipped to the first.
Place them inside the cold room between vertical corner panels and between vertical and ceiling panels.
5.5. For low temperature cold room 105 mm thickness, we recommend installing a balancing pressure
valve in one of the vertical walls, away with areas of turbulence.
5.6. For a better finishing only the exterior corners should be installed.
They have to fit together, from top to bottom as shows the illustration.
5.7. Remove the protection film from the panels.
Connect the electrical supply to the valve and the heating elements (220V + earth).
The electrical supply and the earth that you install shall conform to the UNE-20460 standard.
While the cold room is in use, avoid blocking the air inlet and outlet with the stored goods.
Wait at least 24 hours before refrigerating the cold room.
The cold room should be ventilated during this time.
it is enough to measure each interior wall of the cold room and cut the profile
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido