Descargar Imprimir esta página

Grohe Tectron Instrucciones De Montaje página 7

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 10
10. Align the sensor box horizontally, vertically and parallel
to the wall and then install, see Fig. [8].
11. Route flexible vacant tube (E) between sensor box (C)
and wall-mounting box (A), see Fig. [9].
12. Insert pipes (F) and (G) in wall-mounting box (A),
see Fig. [10].
13. Install isolating valve (H) with spacer (H1) in the pipe.
Do not solder the connections between the pipes and
housing, otherwise the built-in isolating valve may be
damaged.
Close isolating valve (H).
Open hot and cold water supply and check connections for
water-tightness!
Open isolating valve (H) and flush pipes.
Close isolating valve (H).
Electrical installation
Electrical installation work must only be
performed by a qualified electrician. This work
must be carried out in accordance with the
regulations to IEC 364-7-701-1984 (corresponding
to VDE 0100 Part 701) as well as all national and
local regulations.
• Only round cables with max. outside diameter 6 to 8.5mm
may be used.
• The voltage supply must be separately switchable.
1. Connect both pipes (F) and (G) to an earth cable,
see fold-out page III, Fig. [11].
2. Insert 230V connecting cable (L) into the transformer
base (K) and insulate, see Fig. [12].
3. Pull sleeve (M1) over the two live wires (L1).
4. Attach lustre terminal (M); observe assignment,
see Fig. [13].
5. Secure all three wires with the cable tie (M2) near the lustre
terminal (M).
6. Route cable (L2) in an arc and position lustre terminal (M)
on locator in base (K), see Fig. [14].
7. Secure cable (L) using screws (O) and strain relief (N).
8. Fasten cover (P) in base (K) using screw (Q).
Further installation
Note for installer:
• Fit structural shell protection (B) and (D) and screw in place
using internal screws (B1) and (D1), see Fig. [15].
• Do not carry out any further installation procedures until the
tiling is completed.
Note for tiler:
The sensor behind a ceramic bowl must not
be tiled over.
• Take account of max. 2mm grouting joint to structural shell
protection, see Fig. [16].
Performing final installation
Further installation procedures are explained in the final
installation.
Replacement parts, see fold-out page I
( * = special accessories).
4

Publicidad

loading