fig.2
Important : to avoid condensation,
place the seal only along the top of the
C
box (
).
Silicone seal
To complete installation of the roadside panel, open the battery compartment on the
electronic box , box and insert four 1.5 V alkaline LR20 batteries. Be sure to follow
the polarity markings (fig. 7, page 5). Close the battery compartment and put the elec-
tronic box cover back in place with the 6 cross-head screws ( H ), Take care not to
pinch or damage the seal. Do not obstruct the two ventilation slots ( T ) at the bot-
tom of the electronic box (fig. 2, page 3). The optional voltage converter WEADSF
10003 (stable output voltage of 6 V at 200 mA) may be used to control a gate opener
(page 15).
fig.3
M - : white
M + : grey
S - : pink
S + : purple
B
A
GB
7
: black
: red