BRS-CC
6.9 Flow chart
Clean and
inject
Fig. 11
Y1
Y2
Y3
Y4
Air-blast option
Ready
Tab. 15
Approach
position P1
Determine and
eliminate cause
No
Option
Air blast = 1
Waiting time
Approx. 0.5 sec.
Waiting time
Approx. 2 sec.
Option
Air blast = 0
Determine and
No
eliminate cause
Flow chart
5/2 directional valve stroke UP/DOWN
5/2 directional valve for clamping cylinder (CLAMP/RELEASE) and compressed-air
motor (ON/OFF)
5/2 directional valve for wire cutter (ON/OFF)
5/2 directional valve for injector (ON/OFF)
Air blast through cable assembly (ON/OFF)
Home position of the cleaning station (stroke cylinder down, S1 activated)
Explanations
Approach
position P3
Input
Ready = 1
Yes
Approach
position P2
Output
Y2 = I
Output
Y1 = I
Output
Y1 = 0
Output
Y2 = 0
Input
Ready = 1
Yes
6 Putting into operation
Approach
position P4
Output
Y4 = 1
Waiting time
Approx. 1 sec.
Output
Y4 = 0
Approach
position P3
Approach
position P5
Output
Y3 = I
Waiting time
Approx. 0.5 sec.
Output
Y3 = 0
Move out off
maintenance station
EN - 17