Electrical Installation; Important Notes - Lenze L-force Drives EZS3 Instrucciones Para El Montaje Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

6

Electrical installation

6.1

Important notes

Installation must
ƒ
always be in accordance with the operating conditions specified in the
Technical data (¶ 31).
be carried out to EN 60204−1.
Please observe the following when selecting the cable type:
ƒ
The cables used must comply with the approvals required for the
application (e. g. VDE, UL etc.).
Fuses and cable cross−sections must be dimensioned in accordance with
the specifications in the documentation for the basic device.
{
Danger!
Dangerous voltage
All power connections carry dangerous voltages both if the motor is
at standstill and after up to 3 minutes after mains switch off.
Possible consequences:
ƒ
Protective measures:
ƒ
ƒ
EDKZS3YA200 DE/EN/FR/ES/IT 3.0
Death or severe injuries after touching the power connections.
Wait for at least 3 minutes before working on the power
connections.
Check whether all power connections are de−energised.
l
Electrical installation
Important notes
6
35

Publicidad

Tabla de contenido
loading

Tabla de contenido