ENGLISH
MAINTENANCE
WARNING!
All maintenance operations must be performed by qualified personnel, or by an authorized Service Center.
WARNING!
Maintenance operations must be carried out:
–
With the machine switched off
–
With the battery disconnected
–
With the battery charger-electrical mains connecting cable disconnected
Moreover, read carefully the instructions in the Operator Safety Instructions chapter before performing any
maintenance operation.
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
Provided below is the Scheduled Maintenance Table. The intervals shown may vary according to particular working conditions, which
are to be defined by the person in charge of the maintenance.
This Manual contains the Scheduled Maintenance Table and describes only the easiest and most common maintenance
procedures.
SCHEDULED MAINTENANCE TABLE
Procedure
Squeegee Cleaning
Brush Cleaning
Tank and Vacuum Grid with Float Cleaning
Battery Charging
Squeegee Blade Check and Replacement
Solution Filter Cleaning
Screw and Nut Tightening Check
Brush Motor Carbon Brush Check or Replacement
Vacuum Motor Carbon Brush Check or Replacement
(1): and after the first 8 working hours
(2): for these maintenance operations, contact an authorized Clarke Service Center
18
Daily or after
using the
Weekly
machine
Operator's Manual - Vantage 17 Battery
Every six months
Yearly
(1)
(2)
(2)