2.4) Mounting the motor bracket to the pillar (Fig. 6)
Use screws which are suitable for the material the pillar is made of. Mount the bracket horizontally.
2.5) Assembly of the straight arm (Fig. 7)
Use the M8x25 screw with its relative grower washer. Make sure the arm is positioned by making it come out of the front part.
2.6) Mounting the gearmotor (Fig. 8)
Insert the POP in the plate at point C and mount it onto the former using M6x100 screws and the nuts supplied.
2.7) Assembling the curved arm and mounting the adjustable bracket to the leaf (Fig. 9)
Use the M8x45 screw complete with plastic washer to mount the
two arms, and the M8x35 screw for mounting the curved arm with
the adjustable bracket.
The bracket is either welded to the gate or fastened to it using screws
2.8) Releasing the gearmotor from the inside (Fig. 10)
This is carried out in two steps:
A: lift the cover.
B: insert the release key supplied and turn it clockwise until it stops.
2.8.1) Releasing the gearmotor from the outside (Fig. 11) (optional)
The release system is assembled in six steps:
A: remove the plastic cover (1)
B: screw the pin (3) onto the release shaft (2)
C: screw the cable stretcher (4) into the special hole (5)
2.9) Securing the opening stop (Fig. 12)
This is carried out after unblocking the gearmotor, using two M6x25 screws placed in the most suitable position.
2.10) Electrical connections
Consult the Control Unit POA1 instruction booklet for the electrical connections.
2.11) Connection to the power supply (Fig. 13)
On PP7024: connect the 230V supply cable directly to the fuse holder terminal.
On PP7224: connect the cable from the PP7024 unit to the mammoth terminal.
2.12) Using buffer batteries (Fig. 14) (optional)
POP comes complete with housing for buffer batteries (optional). Break open the plastic cap on the control unit box in order to connect the
box with the battery.
3) Manual or release manoeuvre
The manual operation (Fig. 10) must be resorted to in case of pow-
er failures or system malfunctions.
which are suitable for the material the leaf is made of. The two brack-
ets must be 500mm apart (Fig. 5-6), fastened horizontally, and off-
set compared with the motor bracket at 100mm.
D: secure the spring (6) to the pin (3) and to the fastening point visi-
ble in the shell.
E: slide the release cable (7) into the pin hole (3) and cable stretcher (4).
F: replace the plastic cover (1) to its original position.
The manual manoeuvre only allows the gearmotor to travel freely if it
is assembled correctly, complete with original accessories.
G
3