Testing And Commissioning; Testing; Maintenance; Disposal - Nice pop PP7024 Instrucciones Y Advertencias Para El Instalador

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 29

4) Testing and commissioning

These are the most important operations, designed to guarantee the
maximum safety of the automation system. The testing procedure
can also be used as a periodic check of the devices that make up
the automation. The testing of the automation system must be per-
formed by qualified and experienced personnel who must establish

4.1) Testing

1. Make sure that the provisions contained in the chapter "WARN-
INGS" have been carefully observed.
2. Test the opening and closing of the gate and make sure that the
leaves move in the intended direction. The test should be carried
out a number of times to make sure that the gate moves smooth-
ly, that there are no points of excessive friction and that there are
no defects in the assembly or adjustments.

5) Maintenance

The maintenance operations must be performed in strict compliance
with the safety directions provided in this manual and according to
the applicable legislation and standards. POP does not require any
special maintenance. However, periodically make sure (at least once

5.1) Disposal

POP is constructed of various types of materials, some of which can
be recycled (aluminium, plastic, electric cables), while others must
be disposed of (electronic boards).
!
WARNING: some electronic components may contain
polluting substances; do not pollute the environment.
Enquire about the recycling or disposal systems available
in compliance with regulations locally in force.

6) Technical characteristics

Power supply
Max. current
Motor power
Torque
Opening time
Operating temperature
Protection class
Work cycle
Insulation class
*
This version does not have a control unit.

7) Accessories

KIO - Key-operated selector switch with cord-type release
4
what tests should be conducted based on the risk involved, and ver-
ify the compliance of the system with applicable regulations, legisla-
tion and standards, in particular with all the provisions of EN stan-
dard 12445 which establishes the test methods for gate automation
systems.
3. Check the proper operation of all the safety devices, one by one.
4. Measure the impact force according to EN standard 12445.
If "motor force" control is used to assist the system for the reduc-
tion of the impact force, try to find the adjustment that gives the
best results.
every six months) that all the devices are perfectly efficient.
To this end, carry out all the tests and checks described in para-
graph 4.1 "Testing". If other devices are present, follow the directions
provided in the corresponding maintenance schedule.
1. Disconnect the automation system from the electric mains.
2. Disassemble all the devices and accessories, following in reverse
order the procedures described in chapter 2 "Installation".
3. Remove the electronic board.
4. Sort the various electrical and recyclable materials and consign
them to licensed firms for recovery and disposal.
5. Consign the remaining materials to authorized scrap collection
centres.
PP7024
Vac/Hz
230/50
Vdc
/
A
~1
W
Nm
s
°C
PP7024/V1
120/50-60
/
~2
75
180
10
-20°÷50°
IP 44
30%
1
PP7224*
/
24
3
B

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pop pp7224Pop pp7024/v1

Tabla de contenido