A.4. Adjust the inclination of the totem slightly by means of the
nuts or the orientation of the totem by means of the elongated
holes at its base:
Remove the
template
Horizontal regulation
A.5. Carry out the installation of the wallboxes as indicated in the
respective installation manuals:
2
Stop the hose and
make sure you don't
pinch it*
* In the case of wallboxes with 5m cable integrated.
For proper installation according to CASE B, the following steps must be
followed:
B.1. Drill four holes:
Min M20
Totem
Vertical regulation
1
Install Box
3 Install hose holder
B.2. Prepare the anchor kit:
B.3. Threaded rods placement:
First put cement-glue and secondly place the
rods while passing the electrical conduit.
B.4. Locate, adjust and fi x the totem:
Orientation
adjustment through
elongated holes.
9
Remove
template
before