Prepare The Site - Kohler K-4917 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para K-4917:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

14-3/4" (37.5 cm)
1-3/16" (3 cm)
13-1/2"
(34.3 cm)
2" NPT
Tap
18"
(45.7 cm)
Floor
Wall
Finished wall and back of
spud should be flush.
Roughing-In Dimensions
• Roughing-in dimensions are identical if using an optional 3"
outlet spud.
• The urinal complies with ADA requirements when the rim is
mounted no higher than 17" (43.2 cm) from the finished floor.

1. Prepare the Site

Install or relocate the waste pipe as necessary to conform to the
roughing-in dimensions.
Install adequate support framing for the hangers as needed.
Kohler Co.
Wall Hangers
7-3/4"
(19.7 cm)
6-15/16" (17.6 cm)
to Center of
Hanger Slots
6" (15.2 cm)
24"
(61 cm)
11" (27.9 cm)
Finished Wall
2" NPT Tap
3
1-7/8"
(4.8 cm)
23-3/4"
(60.3 cm)
8-1/2" (21.6 cm)
Spud Detail
1048744-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido