EN
Professional Series:
Ventilation is insured by a forced air system through a grille
located in the upper part of the appliance. This grille should
never be covered by panels or any other devices that could
reduce its efficiency. Please refer to page 5-6 to ensure
correct air circulation.
24
7.4 Post installation checklist
Check that the front levelling feet have been properly
installed.
Check that the connection to the water system does
not have any leaks and that the shut-off valve is easily
accessible.
Check that the electrical connection is correctly installed
and that the socket and / or breaker are easily accessible.
Check the perfect alignment of the appliance with
adjacent structures.
Check that all adhesive tape and external or internal
temporary protective devices have been removed.
Check the perfect closing of the doors and the smooth
sliding of the drawers and shelves.
7.5 Start up
• To start the appliance, connect the plug to the electrical
mains: at this point, when opening the door, the control
panel will usually visualize the message "Stand by", and
all the panel keys be off
• To turn on all the appliance compartments, press the Unit
button for three seconds. The display will show the
message "Initial test" for approximately 2 minutes. After
this phase the compressors will start up and remain on
until the compartment set temperatures are achieved. Do
bear in mind that this condition could last several hours
during which time the display will continue to flash the
'Start Up Phase' message.
• If the appliance is provided with an Ice Maker, prior to
switching it on make sure that the water filter cartridge is
installed (unless water supply source is already filtered by
other means such as reverse osmosis).