Preliminary Checks; Installing The Product; Manual Running - Key Automation TURBO 250 Instrucciones Y Advertencias Para Su Instalación Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 26

3 - PRELIMINARY CHECKS

Before the installation starts, we suggest to carry out following
inspections and operations:
the gate framework must be strong and suitable;
the gate must not show too many sideways slide skids during the
running;
the system of wheels/lower rail and roller/upper runner must work
without too many frictions;

4 - INSTALLING THE PRODUCT

4.1 - Manual running

Insert the key in position 1 lock and rotate 90° counter-clockwise (fig.3).
4.2 - Installing
Before starting installation, you should carry out the following
checks, as well as making sure the structure is compliant with
current standards.
Follow the dimensions, create a solid concrete footing and fix the
N.B. The exact dimensions of the rack must be known to allow precise calculation of the counterplate position.
1 lock
2 unlock keys
to avoid the gate derailment you must install the stop beats of the
sliding, whether at the opening or closing, and a second upper
roller/runner in full observance of the current law;
remove any manual lock in the beforehand gates;
take on the gate bottom the feed raceway of the feeding cables
(Ø25-50mm) and of external connection (photocell, flash-light, key
selector, etc...).
Insert the unlock key in position 2 and rotate clockwise until complete
unlock of the pinion (fig.3).
Fig. 3
base plate to the ground immerging it into the concrete using the
bracket clamps and fixing screws (fig.4). If the base already exists
use robust expanding wedges:
provide one or more pipelines for the laying of electrical cables.
Electrical
pipeline
Fig. 4
EN
13

Publicidad

Tabla de contenido
loading

Tabla de contenido