GB
7. Decommissioning
the filling station
• First, drain the tank completely (by means of
the pump via the delivery hose and delivery
nozzle while in a horizontal position).
Next:
• Disassemble the petrol trolley into its constitu-
ent parts, sort by material and dispose of in
accordance with local regulations.
Risk
of environmental contamination
through residues in the tank. Collect
these residues separately and dis-
pose of them in compliance with
local environmental regulations.
20
8. Warranty
Under our general terms and conditions of trade
we warrant that the equipment will be produced
free from defects in materials, functionality or
workmanship.
These can be inspected at
http://www.cemo.de/agb.html
The warranty applies only under the condition
that the above operating and maintenance
instructions and all applicable regulations are
closely followed.
Modification of the filling station by the customer
without consultation with the manufacturer
CEMO GmbH invalidates any claims under the
statutory warranty.
CEMO GmbH also accepts no responsibility for
damage caused by inappropriate use.