Safety Rules; Safety Instructions; Operation; Installation Instructions - Champion cooler 75/85 DD Manual De Instrucciones

Tabla de contenido

Publicidad

Safety Rules

1. Read instructions carefully.
2. Disconnect all electrical service that will be used for the unit before
you begin the installation.
3. Electrical hook up should be done by a qualifi ed electrician, so
that all electrical wiring will conform to your local standards.
4. For a maximum safety precaution, make sure cooler cabinet is
properly grounded to a suitable ground connection.
5. Cooler must be connected to proper line current, voltage and cycle,
as stamped on cooler motor and pump motor specifi cation plate.
6. Do no allow pump to tip over and become submerged.
7. Always DISCONNECT POWER before installing unit or
performing any maintenance.
WARNING:
To reduce the risk of fi re, electric shock and
injury to persons, this cooler must be installed with motors and
pumps listed on the notice decal and marked to indicate suitability
with this model. Other motors and pumps cannot be substituted.

Operation

For the best cooling performance, if the pads are dry, pre-wet the pads
by running the pump for a few minutes before starting the blower.
These coolers may also be used without water for ventilation purposes.
When outside air is cool (for example, at night) or when humidity is
high the water pump can be turned off.
IMPORTANT: To cool effi ciently, you must exhaust the stale or used
air from the building. Open windows or doors or use exhaust fans
located away from the cooler and in the direction you wish to cool
the air. The air will fl ow in the direction of the exhaust openings. A
common guide for the amount of exhaust opening needed is to have
at least 2 square feet of opening per 1000 CFM.
Installation
CAUTION:
Make sure that the mounting surface is strong
enough to support the operating weight of the cooler when in use.
(For operating weight, see Specifi cation Table.)
CAUTION:
Never supply power to cooler until installation
is complete and unit has been tested for rigidity.
CAUTION:
Make sure all bolts are securely tightened before
starting the cooler.
• Louvered Side Panels. The louver
panels have a locking latch on each top
corner to secure it in place. To remove
the louvered panel you will need to
loosen the latch screws on either side of
the panel. Loosen the screws enough
to rotate the latch handle, but do not
remove completely. Rotate the latch
handle towards the center of the lou-
vered panel (see fi g. 1). Tilt the top of the louver panel outward
away from the top pan and lift out from cooler.
To reinstall the panel, fi rst insert the bottom of the panel into the
bottom pan. Tilt the panel forward so that it rests against the top
pan. You will need to keep the latch handles rotated to the side to
keep the lock from hitting the top pan. Once the louver panel is
in place, rotate the latch handle so that the handle is facing down.
Tighten the screws to lock latch and secure panel in place.
2
• Ductwork. See the General Specifi cation table for the duct open-
ing dimension for your specifi c cooler. For down discharge units
models 10/12DD and 14/21DD, the duct must go inside the opening.
Size these ducts slightly smaller than the duct opening in the cooler.
On 75/85DD and 95DD models the duct may go to the inside or
outside of the duct fl ange. The side discharge units have a 1 inch
fl ange. Size these ducts larger than the duct opening to fi t over the
fl ange of these units.
Note: Curbs are not provided. The installer is responsible for
providing curbs or other means to support the cooler.
mend that roof penetration only be as large as ductwork coming from
unit. Water drain should be outside curb if possible.
Motor Installation
• Mount motor. Slide the heads of the provided carriage bolts into
the slots of the adjustable channels. Slide these channels sideways
in the slotted holes to align with the holes in the motor base and to
align the motor shaft with the blower pulley. Mount the motor to
the motor mount using these carriage bolts and the washers and nuts
provided (see Fig. 2). Make sure all bolts are securely tightened.
• Install pulley. Install the adjustable motor pulley so that it aligns
with the blower drive pulley (see Fig. 3) and tighten set screw. See
page 3 for instructions on adjusting pulley.
Electrical Installation
NOTE: Local building code regulations must be observed.
WARNING:
for this unit before you begin the installation.
• Electrical Supply. Cooler must be supplied with the proper line
current, voltage and frequency, as stamped on cooler motor and
pump motor specifi cation plate. See the wiring diagrams on page
4 for typical electrical connections. NOTE: Connecting improper
voltage to motor will void motor warranty.
• Wire sizing. The conductor sizes are to be determined by motor
loads and length of run per national and local electrical codes.
• Switches or contactors. Motors require switches or contactors
of proper current capacity and should be sized and installed by a
competent electrician.
WARNING:
Fig. 1
grounded to a suitable ground connection for maximum safety.
Water Connection
• Overfl ow assembly. Remove nut and place nipple through the hole
in the pan, with the rubber washer between the pan and the head
of the drain nipple (Fig. 4). Screw on
nut and draw up tight against bottom of
pan. Insert overfl ow pipe in nipple to
retain water. The overfl ow pipe may be
removed to drain the pan when neces-
sary. The male threads of the Nipple
are standard 3/4" garden hose threads.
Blower
Housing
Adjustable
Channels
Fig. 2
Disconnect all electrical service that will be used
Make sure that cooler cabinet is properly
Fig. 4
We recom-
Motor
Pulley
Blower
Pulley
Fig. 3
Overfl ow Pipe
Nipple
Rubber Washer
Bottom Pan
Nut
110525

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

95 dd10/12 dd14/21 dd75/85 sd95 sd10/12 sd ... Mostrar todo

Tabla de contenido