Prepare The Site - Kohler K-7549 Guía De Instalación Y Cuidado

Tabla de contenido

Publicidad

Antes de comenzar (cont.)
Seleccione niples lo suficientemente largos para que sobresalgan a través de la
pared acabada.
No utilice productos derivados del petróleo en este producto.
1.

Prepare the Site

8" (20.3 cm)
2x4
Riser Tube
Tube élévateur
Tubo vertical
Rough-in the Plumbing
NOTICE: For exterior wall installations: Ensure proper wall insulation to prevent
frozen pipes.
Attach a 2x4 between two studs according to the illustration.
Position the riser tubes 8" (20.3 cm) apart, then level, and secure the elbows and
risers to the 2x4.
Temporarily secure a pipe nipple to each elbow with sealant tape.
Confirm the pipe nipples are perpendicular to the front edge of the vertical 2x4s.
Confirm the Rough-in Plumbing
Hand tighten an escutcheon onto each pipe nipple.
Slide the faucet assembly onto the escutcheons.
Ensure the escutcheons are aligned and level with one another. Further tighten the
escutcheons, if necessary.
Verify the faucet assembly is properly aligned and level. If necessary, make
adjustments by repositioning the elbows, or escutcheons.
Kohler Co.
Apply sealant tape.
Appliquer du ruban d'étanchéité.
Aplique cinta selladora.
Pipe Nipple
Mamelon de tuyau
Niple
3
Escutcheon
Applique
Chapetón
1169540-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido