Electric submersible pumps for sewage
5.2.1 MOBILE INSTALLATION (fig. 5)
Delivery pipe must have diameter not inferior to the pump inlet.
When using a flexible pipe , it is advisable a reinforced pipe with
metallic spiral which maintains the section unchanged even in
GB
presence of bends.
The eventual foot valve and gate valve must be assembled at a
distance of approx 50 ÷ 200 cm. in a section of metallic pipe (rigid).
Special attention should be paid to the positioning of electric cables
in order to avoid possible bending, pressing, lifting and that the
same are accidentaly sucked by the pump.
When the pump is installed on the bottom of the pit relevant rope
or chain must be anchored to one side of the upper part of pit;
when the pump is suspended the rope or chain must guarantee the
perfect support of the electric pump together with relevant delivery pipe considering also the dynamic reactions
when starting and functioning.
5.2.2 FIXED INSTALLATION WITH COUPLING TO FOOT PEDESTAL (fig. 6)
For the installation of foot pedestal and electric pump proceed as
follows:
- Fix the upper bracket for the guide pipes (fig. 7 – pos. A ) to the
- Locate at bottom of pit the foot pedestal for the automatic coupling
- Take the exact length of the guide pipes (fig. 7 – pos. C)
- Fix firmly the pedestal foot to the bottom of pit with suitable anchor
- Connect the delivery pipe to the foot pedestal outlet
- Disassemble the upper brackets from the edge of the pit and
- Assemble the special skid-flange (fig. 7 – pos. D) on the delivery outlet of the pump and hook the rope or
- Lift the electric pump up to over the pit and let it slowly descend guiding the skid-flange in the guide pipes.
- The hook of lifting rope or chain must be in line with the center of gravity of pump.
- Secure the extremities of rope or chain to the upper bracket located at the edge of the pit.
- Dispose the electric cables avoiding bends and deflections and paying attention that relevant terminals are
1 Electric submersible pump
2 Lifting chain
3 Floating switch / probes
4 Electric cable
5 Electric panel
6
7
8
9 Supplementary pit with grid (optional)
10 Delivery pipe
11 Decantation area
12 Foot pedestal
A device must be provided for cutting off and isolating the power supply.
28
Use and maintenance instructions
edge of the pit
(fig. 7 – pos. B) and check that the guide pipe conical fixations are
perfectly perpendicolar and leveled to the correspondent fixations
of the upper bracket located to the edge of the pit.
clamps or metallic blocks.
insert in the conical fixations of the foot pedestal the guide pipes
previously cutted of correct length and fix them to the brackets
reassembling the same to the edge of the pit.
chain to the handle or slot located on the upper part of it.
not in contact with water.
Non return valve
Gate valve
Pit
Fig. 5
Fig. 6
A
C
B
D
Fig. 7 Foot pedestal