Horizontal Discharge Installation - Broan Elite E64000 Serie Instrucciones De Instalación

Ocultar thumbs Ver también para E64000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. CHOSE THE OPENING(S)
Remove the knockout for the chosen opening(s) (horizontal at the back of the hood or vertical on top). See illustrations below.
V
ERTICAL DISCHARGE
H
ORIZONTAL DISCHARGE
NOTE: For ducted installation only.
Punch out the appropriate electrical knockout hole on top (A) or back (B) of
the hood. Install the wire clamp (included in parts bag).
NOTE: For a non-ducted installation, punch out the back electrical
knock-out (B).

7. HORIZONTAL DISCHARGE INSTALLATION

All internal blower hoods are factory shipped with the blower(s) mounted for a vertical discharge configuration. For a horizontal discharge
configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the back panel of the hood. The procedure
below applies for one or two motors.
Unplug the blower.
Using a 5/16" socket, remove all blower mounting
screws from the inner top of the hood. Keep the
screws for further use.
(INTERNAL BLOWER HOODS ONLY)
1
1
HR0021
(INTERNAL BLOWER(S) ONLY)
HE0085
L
S
M
EFT
IDE
S
L
CREWS
HD0269
9
2
2
A
HR0024
OUNTING
OCATION
3
3
B
R
S
IGHT
IDE
M
S
OUNTING
CREWS
L
OCATION
HD0282

Publicidad

Tabla de contenido
loading

Tabla de contenido