Initial Operation; Putting The Power Strip Into Service; Operation - brennenstuhl EM 235 Instrucciones De Utilización Y De Seguridad

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Prior to Initial Use / Initial Operation / Operation
10. Press the SET-Button
will blink.
11. Press the UP-Button
Example: 15,99
12. Press the SET-Button
Note: As soon as the overload value you entered is exceeded by one of the electrical
devices connected, the OVER LOAD WARNING indicator will blink. The button's
functions are deactivated.
Unplug the electrical device from the power strip and if necessary re-set the over-
i
load warning value.

Initial Operation

Q

Putting the Power Strip into Service

q
Plug the power strip's mains plug into a correctly installed electrical outlet.
i
The LC-display
i
(VOLTac) as well as the current line frequency (Hz). This display combination is
the standard display.
Now you can plug the desired electrical devices into the sockets
i

Operation

Q
CAUTION! POTENTIALLY FATAL DANGER OF ELECTRICAL SHOCK!
Only perform measurements at voltages of over 25 V ~ in compliance with the relevant
safety regulations for the attached electrical devices.
CAUTION! DANGER OF INJURY! Never exceed the maximum prescribed
input voltage.
Note: The power factor shows how high the ratio between the real output and apparent
output of an electrical device. The power factor can lie between 0 and 100. In the
ideal case, the power factor will be equal to100.
Note: You can still access the following functions when the power strip is no longer
28 GB
Steckdosenleiste_Content_DE_GB_NL_SE_ES.indd 28
to confirm your entry. The hundredths place after the comma
4
until you reach the desired value.
5
, to confirm your entry.
4
shows the time (CLOCK), day of the week, current voltage
2
.
1
23.07.14 13:23

Publicidad

Tabla de contenido
loading

Tabla de contenido