Application Area; Electrical Installation - Frico Thermozone AD 200 W Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 52
GB
General recommendations
Carefully read this instruction manual before installation
and use of the AD unit. Keep these instructions in a safe
place for future reference.

Application area

The Thermozone AD200W air curtains are intended
for stationary/permanent installation above entrances
and smaller doors with a height up to 2.5 meters, but
can also be used for industrial heating and drying.
The AD200W has been designed for connection to a
low-pressure hot water supply. The unit can be surface
mounted above a doorway or recessed into a ceiling.
Protection class: IP21
Operation
The air is drawn in at the top of the unit and blown out at
high velocity across the doorway, providing a protective
air shield. The air shield minimises cold draughts and
reduces heat loss through open doorways. For best
efficiency, the air curtain(s) should cover the whole width
of the opening.
The air director/grille is adjustable and is normally ang-
led outwards (5-10°) to achieve the best protection.
The airflow can be adjusted by use of the fan speed
selector (CB30N)
The efficiency of the air curtain(s) depends on the air
temperature and pressure differences across the door-
way and any wind pressure.
NOTE! Negative pressure in the building considerably
reduces the efficiency of the air curtain. Ventilation
should therefore be balanced.
Mounting
The units may only be installed horizontally over a
doorway with the air-stream directed downwards. For
the protection of wider doorways, several units can be
mounted next to each other.
For optimal performance it is recommended that a mini-
mum gap of 60mm is maintained above the air-curtain.
The units can be fitted to the wall or suspended from the
ceiling. Two or three (AD220W) mounting consoles are
included with the air-curtain.
The M6 bolts (2 or 3) which slot into the to the alumini-
um profile on top of the unit can slide sideways, allowing
the consoles to be mounted at different distances from
each other. (See details on page 2-3.)
Fitted on the wall
1. Mount the consoles to the wall, see fig. A or B, page
3
2. Loosen the nuts on the upper side of the air curtain
to be able to fit the consoles between the nut and the
unit.
3. Mount the unit on to the consoles and tightened the
nuts.
22
Thermozone AD 200 W
Assembly and operating instructions
Mounting in false ceiling
See fig. C on page 3.
Mounting with suspension kit (extra)
When using the brackets for pendulum fixing ADPF1
see fig. D on page 3 or ADPK1 see fig E on page 4.

Electrical installation

The air-curtain(s) should only be wired by a competent
electrician, and in accordance with the latest edition of
IEE wiring regulations.
1 Remove the front plate by pressing a screwdriver or
similar in to the two holes (Ø 5mm) underneath the
edge of the front plate. Press until it clicks and the
front plate can be openedand removed. See Fig. on
page. 2
2. Remove the lid of the connection box by removing
the four screws placed on the right side of the unit.
Remove the knockouts on top of the unit for routing of
electrical supply and remote switching cables
Different combinations of fan speed and heat output
are detailed in the wiring diagrams on pages 4-6.
Water connection
The air-curtain has an aluminium finned heating coil (fin
distance 2 mm) with copper tubes suitable for connec-
tion to a closed water heating system.
The heating coil must not be connected to a mains pres-
sure water system or an open water system.
The water pipes (DN15 - 1/2" BSP-F, inside thread)
are connected at the left hand side (when viewed from
inside the building) on top of the unit. (See details on
page 2)
The installation should be carried out by a certified
installer.
NOTE: Care must be taken when connecting the pipes.
Use a wrench or similar to hold the air-curtain connec-
tions to prevent straining of the pipes and subsequent
water leakage during connection to water supply pipe-
work.
A bleed valve should be connected at a high point in the
pipe system and all air bled during commissioning of the
air-curtain.
It is also recommended that a drain valve is fitted in
the supply pipe-work. This should be mounted on the
outside of the AD unit. Air-vent and drain valves are not
included in the heating coil.
Filter
The heating coil is protected by an air filter which covers
the coil face.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Thermozone ad 210 wThermozone ad 215 wThermozone ad 220 w

Tabla de contenido