the machine as preferred, leaving a free space of approx. 50 cm/20" around all sides. This will enable
unhindered access for actual operation, as well as for cleaning and maintenance. For machines equipped with
wheels, ensure to apply brakes by pressing the lever down. Also ensure that machine voltage is the same as
that distributed by power mains (see rating plate on machine rear cover).
For connection to electrical system, fit a suitable plug to the machine power supply cable.
Warning: have the plug fitted to the power supply by qualified electrician. Take the necessary
precautions to prevent the cable from being crimped or damaged.
After mating the plug to the mains socket, the machine is ready for use. First, however, check proper operation
of all moving parts and components of the machine. Thus, check:
Rotation direction of bowl (compare with arrow on bowl) and spiral.
Safety device serviceability: device is serviceable when machine stops the moment the guard is lifted by
10-15 mm/0.4"-0.6".
Operation of push buttons and pilot lamp.
Important: If the machine or some of its parts fail, call your Omcan for repairs.
Note: for machines with three-phase power supply: in case of counter rotation, invert two phases of
the power supply plug. Check bowl rotation each time you replace the power supply plug or change
power mains socket.

TRANSPORT AND HANDLING

The machine, pallet-mounted at origin, is shipped enclosed in an appropriate packing and strapped to the
wooden pallet itself. When unloading the machine from the transport vehicle, lift from the points marked on the
packing using suitable equipment. Unless you need to check its contents, you are recommended not to open
the packing until the moment of installation. To transport the machine to the installation site, use a trolley of
adequate carrying capacity. Remove straps, packing and polystyrene strips. Dispose of this material according
to the regulations in force. Lift the machine and place on the installation site. Remove the supporting pallet
using straps of suitable carrying capacity (approx. 6 times the weight of the machine). These will have to be
slipped under the spiral holder head. The whole operation is to be controlled by adequate manual or power-
driven lifting equipment.

PREPARING THE MACHINE

Prepare the machine before every process cycle. BE SURE that the machine, especially parts which come in
contact with food products (spiral, bowl and column) are clean and sanitized; where necessary clean with hot
water and spirit. Clean with machine off.
7

Installation

Operation