Important; Tools Requiredfor Assembly - Craftsman SEARS Manual Del Proprietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

r" 3
m
-
q
p
FIGURE 1.
ASSEMBLY INSTRUCTIONS
Flat ---=-//_
Washer
| 1_
_ |
5/16" I.D.
_,.-- Hex Lock
Nut 5/16-18
Thread
Hex Bolt
5/16-18 x 8-3/8" Long
IMPORTANT:
This unit is shipped WITHOUT GASO-
LINE or OIL in the engine. After assembly, see opera-
tion section of this manual for proper fuel and engine
oil recommendations.
NOTE: To determine right and left hand sides of your
chipper-shredder,
stand
behind
the unit with the
engine the farthest away from you. See figure 6.
Your chipper-shredder
has been completely
assem-
bled at the factory,
except for the hopper assembly
(hopper hood and upper leaf ramp section have been
sub-assembled),
upper
guide
assembly,
chute
deflector
and the catcher
bag. The hardware
pack
safety glasses and a bottle of oil are also included in
the carton.
The hardware pack contains the parts shown in figure
1 (shown full size).
TOREMOVE C HIPPER-SHREDDER
FROM CARTON
Cut the corners of the carton.
Remove all packing
inserts. Roll chipper-shredder
out of the carton. Make
certain all parts and literature
have been removed
before the carton is discarded.
TOOLS REQUIREDFOR ASSEMBLY
(1) Phillips Screwdriver
(2) 1/2" or Adjustable Wrenches
(2) 7/16" or Adjustable Wrenches
(1) Funnel
uss Machine Screws
1/4-20 x 1/2" Long
Hex Lock Nuts
1/4-20 Thread

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

247.795850

Tabla de contenido