ENGLISH
The reparations in guarantee, except different agreement between
parts, will be effected in our factory in MONTECCHIO MAGGIORE
(VI).
ATTENTION
Don't effect dielectrical test or partial discharge on the electric
machine with the device inserted, avoid if possible to connect
the device directly to the secondary of the transformer to protect,
otherwise the transient overvoltage can damage the device.
This is more evident if the power supply voltage of the device is
230 VAC and in case of capacitors for the remaking.
TESTING CERTIFICATE
The testing procedure is effected as follows:
• Push-buttons working.
• Relays testing contacts.
• Main mechanical checking.
• Calibration and linearization at +30 °C and +150 °C.
• Testing for 48 hours with variable power voltage supply.
• Control output 4-20 mA.
• Insulating testing between earth and relays at 2.5 KV for 60".
18