Co 2 & Tap Tower Installation - Nostalgia Products Kegorator KRS2100 Serie Manual De Instrucciones

Ocultar thumbs Ver también para Kegorator KRS2100 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CO
& TAP TOWER INSTALLATION
2
You must read and understand the steps below for the CO 2 assembly before installation.
When you purchase the first keg of beer, you must also have your CO 2 cylinder filled at
your local supplier. CO 2 tanks can be refilled at locations such as welding supply shops,
party stores, or wherever kegs are purchased.
STEP 1
Make sure white nylon High Pressure
Washer (already installed) is attached
to CO 2 Double Regulator.
STEP 5
After the Backflow Stopper has been
inserted, remove the three parts above.
(cont. on next page)
STEP 2
Use Wrench to attach Double
Regulator to CO 2 Tank connector.
STEP 3
Remove spring from inside the Keg Coupler.
If spring is not present, go on to Step 4.
STEP 4
Make sure Backflow Stopper is inserted
in the Keg Coupler (the Backflow Stopper
goes in with rounded side down).
10

Publicidad

Tabla de contenido
loading

Tabla de contenido