Fitting-in dimensions (mm).
CCS2G
Length (L.E.)
Width
Height
Fit-In Bracket
3.2 Electrical connection
It is essential that the electric installation has earth conductor, as well as a magneto-thermal protection cut-
out differential switch.
The supply network must have the proper section for the equipment consumption.
When the equipment is connected and working, the control panel warning light will be on.
If various pieces of equipment are installed, extension cords and multiple sockets should be avoided.
The manufacturer declines all responsibility in case of not complying with any of the previous items.
CCS3G
765
1095
625
625
200
200
CCS4G
CCS5G
1420
1745
625
625
200
200
9
EN
CCS6G
2070
625
200