Installation; Unpacking; Specifications - Gram FV 120 Serie Manual De Utilización

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Unpacking

CAUTION: Handle with care all time!
Remove the balance from the carton carefully with the following items:
Packing List
1 Main body of the balance.
1 Pan.
1 Pan support.
1 AC power adapter.
1 User.
1 Standard weight (F1 Class).
1 Display.
It is recommended to save the cartons and packing materials for storing and
transporting the balance or returning it for services.

SPECIFICATIONS

MODEL
Capacity
Readability
Repeatability
Linearity
6
FV-120
FV-220
120g
220g
FV-120C
120g
0,1 mg
0,1 mg
0,2 mg
FV-220C
210g

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fv 120c serieFv 220 serieFv 220c serie

Tabla de contenido