KP 2203
Phase digital power clamp meter
(3.) Active Energy (kWh) and
Time (hmin)
a. In Active Energy
measurement mode, voltage
signal must be input into
V1 and COM terminal of the
clamp meter (Figure 11), and
the selector must be turned
to Φ1.So the Active Energy
measurement function is valid,
b. Press
kWh
TIME
starting value of the Active
Energy is "0.000kWh"
and is shown in the primary
display at first, Active Energy
measured time and the bar
graph "0-20-40-60-80-100"
is shown in the secondary
display. For the time is longer,
3
AC
MEM
0 0
20
40
(Figure11. Active Energy
measurements)
Instructions manual |
48
button,
MAX
1000A
600kW
OFF
EX
-
P
MR
W
3
2
Ture RMS
AUTO RANGE
1
kVA
kW / PF
kVAr
A
V / Hz
kWh
3
AC
MEM
h
min
0 0
20
40
MAX
60
80
100
V1
V2
the measured value of Active
Energy is larger. If you need
read the Active Energy value
sometime, press the HOLD
button, so the measured
value display and the display
of the measured time are
locked, but the Active Energy
measurement is continuing
and timing in the clamp
meter. After reading the
display, press HOLD button
again to exit date hold and
continue to measure, Active
Energy value still add up.
Active energy measurement
don't stop until select other
measurement function.
Tested conductor
Earth wire
MAX
600V
CAT.I
I
I
HOLD
OFF
kWh
TIME
RS232
CLEAR
kWh
hmin
60
80
100
MIN
SAVE
COM
V3
Black Yellow
www.grupotemper.com