6. Trial Running
Follow the instructions below to trial operate:
Place the overhead stirrer in safe and stable surface
•
Ensure the required operating voltage and power supply voltage
•
matched.
Ensure the socket must be earthed reliably.
•
Counter-clockwise rotate the speed control button to the end before
•
switch on instrument.
Connect the power cable, ensure the power on and switch ON
•
instrument.
Clockwise rotate the speed control button to the target speed value,
•
and start stirring function.
Counter-clockwise rotate the speed control button to stop stirring
•
function.
Turn the unit off by pressing the switch
•
If these operations above are normal, the instrument is ready to operate.
If not, the instrument may be damaged during transportation, please
contact technical support of manufacturer/supplier.
Note:
1. Overhead stirrer is a high-speed running device. The
system are required to lock securely the corresponding
components in each step of the assembly to avoid any
movement of the main unit or stirring impeller which
would be caused harm or damage to peripheral instrument
and personnel.
2. The stand is a support device for overhead stirrer. The
corresponding components are required to be locked
securely to avoid any movement which would be caused
harm or damage.
3. When install main unit and anti-drop protector, take care
of your fingers to avoid harm
Note:
Do
not
touch
instrument during operation to avoid damage and harm.
Table 5
components
of
7
high-speed
running