Levolor Cellular Shades Guia De Instalacion página 10

Ocultar thumbs Ver también para Cellular Shades:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
INSIDE MOUNT (IM)
STEP 3: INSTALLING THE SHADE
Hang the curved front side of the headrail on the front lip of the brackets.
Rotate the headrail backwards toward the window until a snapping sound is heard.
This will let you know the shade is engaged in the brackets.
Repeat for each bracket.
Install the included operating handle(s) (see additional instructions on page 14).
CAUTION: Be sure the bracket and headrail are properly secured before
!
operating the shade. Failure to do so may result in the shade falling and
possible injury.
10
Cordless Lift Control
Front lip
Front Lip
Spring tab
Spring Tab
Headrail
Headrail

Publicidad

Tabla de contenido
loading

Productos relacionados para Levolor Cellular Shades

Tabla de contenido