8 Putting out of operation
8 Putting out of operation
NOTE
• As the torch cleaning station BRS-CC is integrated into a welding system, putting out of operation
• When putting the system out of operation, ensure that the procedures for switching off each of the
1 Switch off the robot control.
9 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free operation.
During such activities, observe the following:
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power supply and close the compressed-air supply.
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• Maintenance and cleaning work may only be carried out by qualified personnel
• Always wear your personal protective equipment when performing maintenance and cleaning work.
9.1 Maintenance intervals
NOTE
• The specified maintenance intervals are guidance values and refer to single-shift operation.
When using arc welding equipment, always observe the provisions of EN 60974-4 Inspection and testing
plus any national laws and regulations.
Check the following:
Weekly
1 Check the condition of the reamer.
2 Clean the clamping unit and the reamer.
3 Grease the cutter guide after approx. 10,000 cuts.
Tab. 16
Maintenance intervals
EN - 20
depends on the robot control system.
welding system components are observed.
DANGER
DANGER
(in Germany see TRBS 1203).
Monthly
Monthly basic cleaning is recommended, and necessary in the
case of extreme working conditions.
BRS-CC