Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Boom Setup

1. Place puller in approximate position of conduit.
2. Align nose with conduit and lock it in place with long
detent pin.
Greenlee / A Textron Company
3. Butt nose up against conduit threads and conduit
locking nut. Place clamping plate inside of conduit
and tighten knurled nut. Take lock nut off temporar-
ily for more thread engagement if needed.
4. If the conduit is free standing or without threads,
position the nose so that the conduit will butt up
against the flats of the clamping plate.
10
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
®
G3 Tugger
System

Publicidad

Tabla de contenido
loading

Tabla de contenido