Assembly; Boom Assembly/Disassembly - Textron Greenlee G3 Tugger Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY

Boom Assembly/Disassembly

1. Set the base of the dolly
on the ground where it
is flat and has a strong
base structure.
2. Insert the motor adapter
assembly into the dolly.
Make sure to insert the motor
mount as shown in Figure 2.
Attach and lock it with the
pin.
3. Slide in the mid exten-
sion and top extension
boom tubes as shown
in Figure 3. Make sure
all the ring pull detent
pins engage with the
other tubes.
Greenlee / A Textron Company
4. Slide the nose unit
Figure 1
Figure 2
5. Finally, attach the
Note: Lower boom tubes
to completely collapsed
state as shown in Figure
5 before transporting the
cable puller.
Figure 3
9
G3 Tugger
into the top extension
boom tube using the
ring pull detent pin.
motor assembly unit
to the motor adapter
assembly as shown
in Figure 5, using two
clevis pins to lock it in
place.
Tip: Lay the entire
assembly on the
ground to make it
easier to insert the
motor assembly unit.
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
®
System
Figure 4
Figure 5

Publicidad

Tabla de contenido
loading

Tabla de contenido