Ribind JOLLY ONE Manual De Instrucciones página 25

Ocultar thumbs Ver también para JOLLY ONE:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Strip the cable for 27 cm and shorten the 3 power supply wires to 4 cm.
Connect the yellow/green earth wire to the fixed terminal provided on the
motor.
Pass the earth wire of the motor power supply cable through the 1st free
hole in the run stop container.
Connect the earth wire to the aluminium support.
Connect the power supply cable to the clamps provided.
CAUTION: Make the connections according to the chart below (OPEN
button with OPEN clamp, CLOSE button with CLOSE clamp and connect
the direct phase of the power supply to the COM clamp).
B =
CAP =
Electrobrake
Screw the run stop cover back on.
Verify that the switch is on INS (In this phase the micro-switches do not
work and the C1 and C2 run stop cams are automatically regulated).
Capacitor
25
25
25
25
G
B

Publicidad

Tabla de contenido
loading

Tabla de contenido