Pressure Testing; Pressure Test Method - Verona VECTGV304SS Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pressure Testing

The appliance must be isolated from the gas supply
piping system by closing its individual manual shut-off
valve during any pressure testing of the gas supply
piping system at test pressures equal to or less than
1/2 PSIG (3.5 kPa).
This appliance, as well as its individual shut-off valve,
must be disconnected from the gas supply piping sys-
tem during any pressure testing of the system at test
pressures in excess of 1/2 PSIG (3.5 kPa).
When checking appliance regulator function, make
certain pressure of natural gas supply is between 6
and 14 inches of water column or, if converted for LP
gas, between 11 and 14 inches.
THE PRESSURE TESTING SHOULD BE PER-
FORMED BY MEANS OF THE INJECTOR THREAD
ZONE
1
Gas test inlet
Thread
Figure 13.

Pressure Test Method

x
Remove grate and burner cap
x
Remove aluminum gas spreader
Temporarily remove the injectors
x
x
Connect the pressure Test instrument into injector
holder thread zone (M6x0,75)
x
Check if the cooktop has the correct pressure
x
Fix the injector removed for testing and replace
the parts in the right position.
Installation Manual
ENGLISH
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vectgv365ss

Tabla de contenido