Routine Maintenance Plan - entrematic Ditec PWR25H Manual Tecnico

Ocultar thumbs Ver también para Ditec PWR25H:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 84

7 . Routine maintenance plan

Perform the following operations and checks every 6 months or based on the intensity of use of
the automation.
Disconnect the 230 V~ power supply and batteries (if present):
- Clean and lubricate the gate's rotation pins, hinges and drive screws with neutral grease.
- Check the resistance of the fixing points.
- Check the electrical wiring is in good condition.
Reconnect the 230V~ power supply and batteries (if present):
- Check the power adjustment.
- Check that all commands and safety functions (photocells) are operating correctly.
- Check that the release system is working correctly.
- Test the batteries (in continuity) if present, disconnecting power and performing a few manoeuvres
in succession. Once performed, turn on the 230 V~ power supply again.
37

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ditec pwr35h

Tabla de contenido