Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CABINET PREPARATION

1) The range is a free standing unit. If the unit is to be placed adjacent to cabinets, the clearances
shown in fig. 9 (PRD3630) & fig. 10 (PRD3030) are required. The same clearances apply to island
installations.
2) The range can be placed in various positions with respect to the cabinet front, with the front either
flush or projecting, depending on the countertop depth.
3) The gas and electrical supply should be within the zones shown (fig. 9, 10 & 11).
4) The maximum depth of over head cabinets installed on either side of the hood is 13" .
5) Any openings in the wall behind the range and in the floor under the range must be sealed.
6) When there is less than a 12" clearance between combustible material and the back edge of the
range (above the cooking surface), a Low backguard or High Shelf backguard must be installed,
(fig. 12-Island ). When clearance to combustible material is over 12" , an island trim may be
installed (fig. 12-Standard). These parts must be ordered separately (model PRD3030 is shipped
standard with a 9" Low backguard). Fig. 12 indicates the space required for each type of
backguard.
7) Always keep the appliance area clear and free from combustible materials, gasoline and other
flammable vapors and liquids.
8) Do not obstruct the flow of combustion and ventilation air to the unit.
18" Min.
35-3/8" max. for level counter,
36-3/4" max. with range
leveling legs fully extended
∆ As defined in the "National Fuel Gas Code"
(ANSI Z223.1, lastest edition).
The horizontal surfaces of the range top (cooktop)
trim must not be below countertop level.
min. 36" wide hood
12" min. to combustible
material , each side
4 "
12 "
12 " 4 "
cooking surface
3-1/4 "
electrical
3-1/2 "
supply
gas supply
Fig. 9 PRD3630 Model Only
9
13"
CAUTION:
Max
36" min. to
combustible
material ,
from cooking
surface

Publicidad

Tabla de contenido
loading

Tabla de contenido