Kohler K-7302 Guia De Instalacion página 11

Ocultar thumbs Ver también para K-7302:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Trip
Lever
Lift
Rod
Cotter
Pin
9. Install the Drain and Supplies
IMPORTANT! The drain steps apply to the K-8040 and K-8046
models only.
Install the drain according to the drain manufacturer's
instructions.
If necessary, connect the lift rod assembly.
Cut the supply tubes, making sure there is enough length for the
required penetration of the tubes into the supply-stops.
Debur all tubing cuts.
Slip the coupling nuts onto the supply tubes.
Carefully position the round end of the supply tube (either flared
end or ferrule) squarely into the valve body inlet.
Hand tighten the coupling nuts.
Carefully bend the supply tubes to align with the supply stops.
Slide a coupling nut, then a ferrule, onto each supply tube.
Insert the supply tubes into supply stop outlets, positioning the
round ends of the ferrule squarely into the outlets.
Tighten all coupling nuts.
Kohler Co.
Push
Supply Tube
Rod
Valve
Supply Stop
Yoke
11
Coupling Nut
Ferrule
111290-2-BC

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-8040K-8046

Tabla de contenido