Electrical Connections; General - Nibe HPAC 28 Instrucciones De Instalación Y Mantenimiento

Ocultar thumbs Ver también para HPAC 28:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

GB Electrical connections

Electrical connections

General

Electrical installation of the HPAC must be carried
out under the supervision of a qualified electrician.
The front cover is removed by pulling out the lower
edge and then lifting it up.
The internal covers are opened by slackening the
screws at the edges.
129
130 131
26
132 133
HPAC 28
NOTE!
Electrical installation and service must be
carried out under the supervision of a qua-
lified electrician. Electrical installation and
wiring must be carried out in accordance
with the stipulations in force.
121
5
122 134
123 124
4
71
70

Publicidad

Tabla de contenido
loading

Tabla de contenido