Wolf PRO ISLAND HOOD Guia De Instalacion página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

IN S TA L L AT I O N
Installation
Remove the hood's internal frame indicated by the
3
shaded area. Remove only the four screws indicated in
the illustration below.
Remove the electrical box from the inside the hood.
4
Refer to the illustration below.
REMOVE SCREWS
Internal frame
ELECTRICAL
BOX
Electrical box
Remove the transition, hold-down brackets, and screws
5
from the packaging and use the hold-down brackets and
screws to secure the transition to the top of the hood.
Refer to the illustration below.
Lift the hood into position aligning the hood mounting
6
holes with the pre-drilled holes in the ceiling framing.
Install the four provided lag screws with washers through
each corner of the top plate and into the ceiling framing.
Refer to the illustration below.
Install the provided hex head screws through the
7
remaining holes in the hood's top plate and into the
ceiling framing.
Insert Romex
®
wire(s) into the electrical knockout and
8
secure with the provided connector.
Connect the ducting to the transition and secure with
9
duct sealing tape.
Reinstall the internal frame.
10
HOLD-DOWN
BRACKET
TRANSITION
Transition mounting
HEX HEAD
SCREW
LAG
SCREW
Hood installation
wolfappliance.com | 7

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido