Riello GS10/M Instrucciones Para La Instalación, Uso Y Mantenimiento página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

CONNECTION OF PRESSURE TAPS TO GAS TRAIN
Connect proceeding as follows:
Secure the three G1/8 connectors (one supplied
with the burner and two with the train) at points A,
P f and P l .
Secure the M12 connector at point B.
Cut the pipe supplied with the burner into equal
halves.
Connect boiler tap A with valve tap P f and sleeve
tap B with valve tap P l using the previously cut
pipes.
2622
A
B
6
GB
Pf
D4272
P l

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gs20/m37555563755756

Tabla de contenido