Descargar Imprimir esta página

Berker Wachter 110 AP Manual Del Usaurio página 25

Publicidad

Installing the connection box
(1) Connection box
(12) Fastening holes
(13) Cable entry
(14) Surface-mounted cable entry
(15) Condensation hole
(16) Central fastening dome
(17) Terminals
o
Slacken manual knob (5).
o
Incline sensor head and slacken central screw
(6).
Cable entry from below.
o
When the connecting cable is laid on the
surface, open cable entry (14) in the connection
box.
o
Unless installing in dusty areas, break out the
condensation hole (15) in the connection box.
o
Fasten connection box using suitable screws.
i
Les intempéries, par ex. de la pluie, du
brouillard ou de la neige, peuvent réduire la por-
tée.
Monter le boîtier de raccordement
(1) Boîtier de raccordement
(12) Trous de fixation
(13) Passe-câble
(14) Passe-câble en saillie
(15) Trou d'eau de condensation
(16) Dôme de fixation central
(17) Bornes de raccordement
o
Desserrer la manette (5).
o
Incliner la tête du capteur et desserrer la vis
centrale (6).
Introduction du câble par le bas.
o
Lorsque le câble est posé en saillie, ouvrir le
passe-câble (14) dans le boîtier de raccorde-
ment.
o
À moins d'un montage dans des locaux poussié-
reux, défoncer le trou de d'eau de condensation
(15) dans le boîtier de raccordement.
o
Fixer le boîtier de raccordement avec des vis
appropriées.
25

Publicidad

Capítulos

loading

Productos relacionados para Berker Wachter 110 AP