Assembly And Operation; Prior To Operation; Installing And Removing Router Bit - Freud FT1700VCE Instrucciones De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY & OPERATION

PRIOR TO OPERATION

1. Check Power Supply
Ensure that the power source to be utilized conforms to the power source requirements
specified on the tool nameplate. Ensure the receptacle being used accepts the plug tightly. If
a faulty receptacle is used, it may cause overheating, resulting in a serious hazard.
2. Check Work Area
Confirm that the work site is placed under appropriate conditions conforming to precautions
prescribed in the safety section of this manual.
3. Before Plugging in the Tool
Ensure that the power tool switch (D) is in the OFF position to prevent the tool from accidental
start up which could cause serious injury.
INSTALLING AND REMOVING THE BIT (2 OPTIONS)
WARNING: Disconnect tool from power source. Make sure the correct collet is selected to
match the bit shank diameter before proceeding.
Option 1 – Hand Held Use
a) Open base clamp (O) on the router base (H). - Fig 1a
b) While pressing the router base release button (M), push down the router handles until the
entire collet extends past the base. Rotate Locking Lever (R) until it engages the Spindle
Lock (N) - Fig 1b
Fig. 1a
English
1
9
Fig. 1b
2
3

Publicidad

Tabla de contenido
loading

Productos relacionados para Freud FT1700VCE

Este manual también es adecuado para:

2426738985

Tabla de contenido